Easier to read with cream paper, a tint, more contrast or larger text? Choose your colours and text, once, for every page.

Preview

NC 2.6: Working out the cable and ports

This is the first page of the lesson. Read it and have a go at the activities. The rest is in the full lesson.

65 minutes

Ten metres short

An installer pulls the last cable of the day and finds the drum is empty. The wall socket is still ten metres away. A van trip, a lost afternoon and an angry customer follow.

A few sums at the start of the job stop this. Quantities are worked out before anything is bought.

Key words

WordWhat it means
Requirementsomething the customer needs
Route lengththe distance a cable travels from outlet to rack
Slackextra cable left at each end for fitting and repair
Druma box or reel that holds a length of cable
Porta socket on a patch panel or switch
Spare capacityextra room kept for growth
Patch panela frame of ports where the fixed cables end
Resourcespeople, kit and materials a job needs
Percentagea number out of every 100

The cells students fill in are left blank in this preview.

By the end of this lesson

Note

I can gather requirements, work out whole-number quantities of cable, ports and panels, and spot the issues a plan may hide.

Starter: the specification

Have a go

Starter: the specification

3 questions
Have a go: your answers are marked here and then forgotten. Sign in if you would like your score kept, and to pick up where you left off.Sign in to keep your score

Your answers are marked here and are not kept. A college account keeps every student’s marks.

Gather the requirements first

Ask the customer short, clear questions before any sums.

How many users? How many outlets in each room? How fast must the links be? Are there phones, cameras or Wi-Fi points that need power over the cable? Where is the rack? How much will the site grow in five years?

Resources and place

Then list the resources: how many people, for how many days, with which tools and software. Check the location of each part: where the outlets and rack go, where the cable will run, and how far each run is.

Measure the real route, not a straight line. A cable goes up the wall, along the ceiling and down again.

Worked example: cable for three runs

RunRoute lengthSlack addedCable needed
Outlet 130 m5 m35 m
Outlet 245 m5 m50 m
Outlet 360 m5 m65 m
Total135 m15 m150 m

The cells students fill in are left blank in this preview.

Check: cable for the runs

Have a go

Check: cable for the runs

3 questions
Have a go: your answers are marked here and then forgotten. Sign in if you would like your score kept, and to pick up where you left off.Sign in to keep your score

Your answers are marked here and are not kept. A college account keeps every student’s marks.

The lesson goes on

8 more parts of this lesson are in the full curriculum, with the tasks, the final check and the labs. A college account gives your students all of it.