Easier to read with cream paper, a tint, more contrast or larger text? Choose your colours and text, once, for every page.

Preview

DI 1.16; NC 1.15; DS 1.15: Carrying out a risk assessment

This is the first page of the lesson. Read it and have a go at the activities. The rest is in the full lesson.

60 minutes

Your first assessment

Your manager says: "Check the risks on the reception computer by Friday." Where do you start?

Good news: there are five steps, and you always do them in the same order.

By the end of this lesson

Note

I can carry out a simple risk assessment and record what I find.

Key words

WordWhat it meansExample
Componentone part of a systemA cable, a disk, a user account
Probabilityhow likely a risk is to happen
Impacthow much damage it would do
Risk scoreprobability times impact
Prioritiseput the risks in order, the biggest first
Technical termthe exact word used in IT, such as "malware" or "patch"
Malwareharmful software
Mitigationan action that makes a risk smaller

The cells students fill in are left blank in this preview.

Starter

Have a go

Starter

3 questions
Have a go: your answers are marked here and then forgotten. Sign in if you would like your score kept, and to pick up where you left off.Sign in to keep your score

Your answers are marked here and are not kept. A college account keeps every student’s marks.

Five steps of a risk assessment

  1. Assess the system. List its parts, the components.
  2. Identify risks. What could go wrong with each part?
  3. Calculate. Give each risk a probability and an impact.
  4. Analyse and prioritise. Work out the score and put the biggest first.
  5. Record. Write down what you found and what you will do, briefly, with the right technical terms.

Worked example: the reception computer

RiskProbability 1 to 5Impact 1 to 5ScoreOrder
Hard disk failure, no backup34121
Malware from an email43122
Visitor reads the screen4283
USB drive left in the port2244

The cells students fill in are left blank in this preview.

When two scores are equal

Tip

Both of the top two score 12. Put the one with the higher impact first, because it does more harm if it happens. Here that is the disk failure.

The lesson goes on

4 more parts of this lesson are in the full curriculum, with the tasks, the final check and the labs. A college account gives your students all of it.